CAMPO VALDES CR47 #81-52 EDIFICIO DUNLOP
SAND AND STONES FOR THE CONCRETE USED FOR CONSTRUCTION OF THE  COLUMNS
SURPRISE, 2 REALLY BIG HOLES.
LOTS OF CEMENT AND STEEL, THERE WILL BE MUCH MORE TO COME
AN IMAGE OF AN EXAMPLE HOW THE REBARS ARE CONNECTED AT THE FOOT
A HOLE, 1.8m DEEP
Obra-Negra
ALL WORK IS DONE  MANUALLY
MANY ROCKS HAVE TO BE REMOVED BY JULIAN BEFORE THE COLUMNS CAN BE CONSTRUCTED
FIGHTING THE BIG ROCKS WHICH HAVE TO BE BROKEN AND REMOVED
I DID NOT EXPECT THE WORKS ARE THIS DESTRUCTIVE FOR THE OLD HOUSE
DIONISIO FIGHTING AN EXTREMELY BIG ROCK WITH "Madre Ana", THE MASSIVE HAMMER
THIS ONE IS TOO BIG, THE ENGINEER IS CONSULTED
EVERYTHING IS MADE UP TO STANDARDS
THE ROCK IS COVERED
JAN/FEB, EVERY DAY RAIN
IN ONE MORNING THE ROOF IS GONE
JULIAN, HUGO, ERLIN AND SON WAITING FOR THE RAIN TO STOP
ON A RAINY DAY THE ROOF IS GONE
THE HOUSE IS ALMOST GONE, AFTER 80 YEARS OF USE
PREPARING FOR CONSTRUCTING FLOORS
CLEANING UP
THE HOUSE WAS DEMOLISHED AND MOVED OUTSIDE IN JUST 2 DAYS
prev / next